Colton is cut into pieces by track. The Colton Crossing, where the Union Pacific and BNSF main lines meet, was one of the busiest at-grade rail junctions in the country until it was separated onto a flyover in 2013, and the yards and spurs that fan out from it still decide which streets a mixer can reach and from which direction. We route deliveries and set pour times around that, because a truck holding on a blocked crossing in August heat is a load of concrete going off in the drum.
Cement has been made in this city since the 1890s, when quarrying began at Slover Mountain for what became the California Portland Cement plant, and the mountain has been going into buildings across Southern California ever since. It means the mix on your Colton job has one of the shortest hauls in the region, which is worth one thing: we batch for the temperature on the day and get the truck on site inside the window, rather than adding water at the chute to keep a load workable.
Building permits for slabs, walls and structural work come from Development Services at the City of Colton, and anything in the parkway, across the public walk or at the drive approach needs a separate encroachment permit from Public Works. We file both, meet the inspector and close the permit out. We work the whole city, from the older grid in South Colton to the canyon lots on the east side, and we measure on site because the ground under them is not the same.