Serving Riverside, CA and surrounding areas.(951) 584-0685
Riverside Concrete Pro

Concrete Patio Construction in Riverside, CA by a Licensed Contractor

Riverside Concrete Pro builds back-garden patios 4 inches thick on compacted base, set to fall away from the house wall, with the joints cut the same day. Every estimate is measured and written on site.

Google reviewsFacebook reviewsBetter Business Bureau reviews5.0 Stars Rated by our customers · Google, Facebook and the BBB
Concrete patio being finished behind a home in Riverside, CA
Crew screeding a fresh concrete patio slab in a Riverside back garden

How we build them

How We Build a Patio in Riverside

A patio fails at the house before it fails anywhere else. A slab poured tight to the wall and falling the wrong way sends every storm into the stem wall, and by the time the stucco darkens along the bottom the damage has gone inside. Put a compressible joint at the wall, screed a quarter inch of fall per foot away from it, and the same 4-inch slab sits flat for 30 years.

Marco Delgado started Riverside Concrete Pro in 2021 after 15 years pouring flatwork across the Inland Empire, and he sets the fall on every patio himself. Back gardens here are reached through a side gate or an alley, so the first thing measured is not the slab but the route the concrete takes to reach it, a 60-foot barrow run changes the crew, the pour rate and the shape of the day.

Patios are built under a CSLB C-8 concrete license with liability insurance on every job, to the California Residential Code. A slab that carries a solid cover or an outdoor kitchen is drawn and permitted through Building and Safety at the City of Riverside before it is poured. The work carries a written workmanship guarantee against defects in how it was built.

Warning signs

How do you know if your patio needs replacing?

Water running back at the house

A patio should shed a quarter inch per foot away from the wall. When it falls the other way, rain gathers against the stucco and soaks the stem wall every winter. Grinding the surface cannot move the fall, so the slab is broken out and re-poured to grade.

A crack out of an inside corner

An L-shaped patio pulls in two directions as it cures, and the inside corner is where the pull meets. With no joint cut through that corner the crack finds its own line within a year or two. A re-pour puts the joint where the stress already wants to go.

One edge lifted by a root

The older Riverside streets have shade trees standing close to the house, and a root under an unreinforced 4-inch slab lifts it in one plate. Cutting the root buys a season and risks the tree. The new slab is routed clear of it or bridged over the run.

Heave after a wet winter

Clay in the arroyos here swells above an Expansion Index of 20, the line California code draws, and lifts whatever sits on it once it takes water. A patio that rises at one end each winter and drops back each summer is on that ground, and only a rebuilt base ends it.

What's included

Every Concrete Patio in Riverside Includes

Standard on every patio we pour, with no add-ons. Each one answers something a back garden does to a slab that a frontage never does: the house wall it meets, the trees around it, and the sun it takes all afternoon.

Shape marked out full size

The outline is pegged in the garden and walked with you before anything is dug, so the size is agreed at full scale rather than off a sketch.

Access route boarded over

Lawn, gate posts and the side path are boarded before the first barrow goes through, and the run is swept and washed down at the end of each day.

Base compacted, not spread

Class 2 base goes in and is plate-compacted in layers, so the slab beds on drained ground rather than on loose fill that settles under it.

Joint at the house wall

A compressible joint separates the slab from the building, so the patio can move a little without pushing the stem wall or the stucco above it.

Fall screeded off the wall

The surface is set to about a quarter inch of fall per foot, away from the house, so a storm drains into the garden instead of into the foundation.

Jointed within 12 hours

Control joints are cut the day of the pour, in panels close to square and through every inside corner, so the shrinkage lands in a line you chose.

Edges tooled, top worked

Every edge is hand-tooled and the surface broomed for grip or stamped and colored, with the finish written on the estimate before a truck comes.

Kept damp for seven days

Curing compound goes down the same day and the slab is watered for a week, which is the difference between a sound surface and a crazed one here.

Your options

Riverside Patio Finishes, Compared

Four ways to finish a back-garden slab, judged on how long each lasts, what it suits, what it asks of you and how long the crew is in the garden. All four sit on the same compacted base, because that is the half that decides the rest.

OptionLifespanBest forUpkeepTime in the garden
Broom-finish concrete30 to 40 yearsA table, chairs and a barbecueReseal every 4 to 5 years1 day, then 7 to cure
Stamped concrete25 to 30 yearsShaded gardens on the older streetsReseal every 2 to 3 years2 days, then 7 to cure
Exposed aggregate35 years or moreWest-facing lots that take afternoon sunReseal every 4 years, rinse each spring2 days, then 7 to cure
Interlocking pavers30 to 50 yearsArroyo clay that may still moveSweep sand into the joints yearly2 to 3 days, no curing

Color decides surface heat more than material does: a dark stamped patio on a west-facing lot reads hot underfoot from June through September.

A finished broom-finish concrete patio behind a Riverside home

Local knowledge

What Makes a Riverside Patio Different

The ground under a patio changes by terrace across this city, and a thin slab feels it more than a driveway does, because nothing heavy sits on it to hold it down.

On the flats near the Santa Ana River and Fairmount Park it is river sand and gravel that drains and compacts easily; under the Wood Streets and Victoria Avenue, decomposed granite and sandy loam; in the arroyos, clay that swells once it takes water. So the base is built to what the probe finds rather than to one standard depth, read against the USDA Web Soil Survey, and through July and August the finish is worked early and the slab watered the full seven days.

We build patios behind bungalows in the Wood Streets, post-war houses through Arlington and La Sierra, and 1990s and 2000s homes in Orangecrest, Mission Grove and Canyon Crest. On a west-facing lot the shade is the design problem rather than the concrete, which is why the finish and the color get decided out in the garden, at the hour of day you actually plan to sit there.

Our process

How a Riverside Patio Job Runs, Start to Finish

From the morning it is measured in the garden to the day the furniture goes back on it. One crew, one written figure, and the access route agreed before a barrow is loaded.

1

Measured out in the garden

Marco Delgado pegs the shape, measures the fall at the house wall and checks the side gate for width. The estimate is written before he leaves.

2

Finish, layout and a date

You choose broom or stamped and where the joints fall. A slab carrying a solid cover is drawn and permitted through Building and Safety first.

3

Dig-out and access boards

The old slab or lawn comes out to depth, boards go down the side path, and the subgrade is probed and proved before any base is brought in.

4

Base, forms and the pour

Base compacted in layers, forms set to the fall we agreed, then the concrete placed, the edges tooled and the finish worked with the owner on it.

5

Curing and hand-over

Joints cut within 12 hours, curing compound down and the side path washed off. You walk the slab with the owner and take the written guarantee.

What moves the estimate

What Decides a Riverside Patio Estimate?

Area sets the floor and access sets the rest. A patio that holds a table and six chairs runs about 250 to 400 square feet; past that the number moves on how the concrete reaches the garden and what the ground under it needs.

How the concrete gets in

A mixer at the curb and a 60-foot barrow run through a side gate is a different day from a pump over the roof, and often the largest single line.

The ground you are on

River sand off the flats wants base and little else. Arroyo clay wants digging deeper and a thicker compacted layer before a slab goes on it.

Shape, corners and steps

A rectangle is one set of forms. Curves, inside corners and a step down to the lawn add forming and hand-tooling to the same square footage.

Finish, color and cover

Broom is the baseline and stamped adds hands at the pour. Footings for a patio cover are poured with the slab and drawn on the same permit.

The visit is free and the figure is written out in the garden, and we call back within 1 business day to arrange it. (951) 584-0685 or send us a message.

Ready to price your Riverside patio?

Send the form or call, and someone rings you back within 1 business day. We measure the garden, walk the access route with you and write the figure there, and nothing is owed if you go no further with it.

Request a Free Estimate

Written on site · No obligation

By submitting, you agree to our disclosure and consent terms, including being contacted by Riverside Concrete Pro.

Reviews

What Riverside Homeowners Say About Their Patios

Reviews left on Google, Facebook and the BBB by homeowners we built patios for. All three are about back-garden slabs rather than driveways or footings.

Google review

“Our garden is behind a side gate barely wide enough for a barrow and they still poured 320 square feet in a morning without marking the lawn. Marco set the fall himself, and the first real rain ran off into the beds instead of standing at the back wall.”

Cesar C. of RiversidePatio construction · Google · 2026
Facebook review

“The old slab sloped back toward the house and the stucco had gone dark along the bottom of the wall. They broke it out, re-poured 280 square feet falling the other way and put a joint in at the building. Two winters on and that wall has stayed dry.”

Ben T. of RiversidePatio construction · Facebook · 2026
BBB review

“West-facing garden, so they talked us into a light stamped color instead of the dark one we had picked out. It is walkable in August, which the old brick never was. Joints were cut the same afternoon and there is not a line in it anywhere yet.”

Rafaela X. of RiversidePatio construction · BBB · 2025

FAQ

Questions About Concrete Patios in Riverside

Thickness, drainage, access, permits, heat and the guarantee, answered for a Riverside back garden rather than for concrete in general.

(951) 584-0685
  • How thick should a concrete patio be in Riverside?

    4 inches on a compacted base is right for a patio holding furniture, a barbecue and people. Thickness only goes up where something heavy sits in one place, a spa, an outdoor kitchen island, the posts of a cover, and there we pour a thickened edge or a footing under that point rather than a deeper slab across the whole garden. What we pour is written on the estimate.

  • Which way should a patio slope away from the house?

    Away from the wall, at about a quarter inch of fall per foot. That clears a storm in minutes and is still flat enough that a table does not rock on it. A slab that falls the other way puts water against the stem wall every winter, and it is the fault worth fixing first, because the damage ends up inside the house rather than on the concrete.

  • Do I need a permit for a patio in Riverside?

    Usually not for a slab on the ground, but we confirm it rather than assume it, the city's exempt list names driveways and walkways, and a patio is read against those. A patio cover, a solid roof over the slab, or an outdoor kitchen carrying gas and water goes through Building and Safety at the City of Riverside for drawings and a permit. We file for the ones we build and stand the inspection.

  • Can a concrete truck reach a back garden?

    Usually not, and it does not need to. The mixer stays at the curb and the concrete goes through the side gate by barrow, or over the roof by pump where the run is long or the gate is narrow. That route is walked and measured on the estimate visit, boards are laid over lawn and paving, and the access is priced as its own line rather than discovered on pour day.

  • How long before we can use a new patio?

    Foot traffic after 24 to 48 hours, furniture at seven days, and anything heavy such as a spa at 28 days, when the concrete has reached full strength. A chair dragged across a green slab scores it permanently, so the week is worth waiting out. We give you the date on the day of the pour and leave the curing compound working until then.

  • Does a concrete patio get too hot to walk on?

    A light broom finish stays usable through a Riverside afternoon over 95 degrees; a dark stamped one on a west-facing lot with no tree does not. Color decides that more than the material does, which is why the finish is chosen out in the garden at the hour you plan to use it. Where the sun cannot be avoided, a cover on footings answers it better than a paler slab.

  • Is stamped or broom finish better for a patio?

    Broom costs least to lay, grips underfoot when it is wet and wants a reseal every 4 to 5 years. Stamped concrete is patterned and colored while the slab is still plastic, which puts more hands on the pour, and it wants resealing every 2 to 3 years because the color goes before the surface does. Underneath they are the same slab on the same base.

  • Is a new patio guaranteed in Riverside?

    Yes, in writing. The guarantee covers defects in how the patio was built, the compaction under it, the fall away from the house, the joints and the finish, and its terms sit on the estimate you sign. It does not cover staining, wear, or ground movement beyond what the joints are cut to control. Where the fault is ours, Marco Delgado comes back out to it himself.

Service area

Concrete Patios Across Riverside and Nearby

The eight nearest towns we build patios in, with the straight-line distance from Riverside. The full list runs to 20 towns inside 25 miles.

Show All Areas We Serve

Start your Riverside patio project today

Call or send the form and someone rings you back within 1 business day to fix a time. The measurement is free, the figure is written before we leave, and there is nothing to pay if you go no further.